Offer · Regulatory diagnostic and energy trade-offs

Your data center exceeds 500 kW, or your project exceeds 1 MW. You must report your indicators every year and, above 1 MW, reuse your waste heat or show that it is impossible. We help you report accurately and decide before technical choices are locked in.

You receive:

  • a statement of your obligations given your capacity and permit date
  • PUE, WUE and ERF calculated consistently, with their assumptions
  • the waste heat cost-benefit analysis, or a review of it
  • for a project, a comparison of cooling options on all three indicators
or call us: +33 6 63 93 78 35

First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.

The problem. Three indicators are now looked at together: energy (PUE), water (WUE) and reused heat (ERF). They do not always point the same way. Cooling that improves PUE can raise water use, and heat rejected at low temperature is hard to reuse. These trade-offs are made at the concept stage: once the site is delivered, there is little room left.

THREE INDICATORS, THREE QUESTIONS

What each one measures PUE (Power Usage Effectiveness): total data center energy divided by IT energy. The closer to 1, the less the infrastructure uses around the servers
WUE (Water Usage Effectiveness): water used by the site relative to IT energy, in litres per kWh
ERF (Energy Reuse Factor): the share of energy consumed that is reused outside the data center, for example in a heat network. An ERF of 0.20 means the equivalent of 20% of the energy consumed is reused

WHAT YOU MUST DO, BY CAPACITY

ThresholdObligationDeadline
500 kW and above
installed capacity, per site registration
Report administrative, environmental and energy information each year on a digital platform, and publish part of it on a dedicated web page whose address is sent to ADEMEBefore 15 May, for the previous calendar year. New sites: within two months of commissioning
500 kW and aboveSubmit sustainability indicators, including PUE, WUE and ERF, to the European data center databaseEach year, before 15 May
1 MW and aboveReuse waste heat: the site is deemed compliant if its ERF is at least 0.20. This threshold can be raised to 0.40 by ministerial orderSince 1 January 2026
1 MW and above, impossibility shownExemption possible if a cost-benefit analysis shows technical or economic impossibility. The operator must still reuse the feasible sharePermits filed before 1 January 2026: analysis due before 1 October 2027

Non-compliance: formal notice with up to a year to comply, then an administrative fine of up to €50,000 per data center. The sanction may be published. Several points are still to be set by ministerial order: the detailed reporting fields, how impossibility is assessed, and a distance threshold beyond which the absence of a heat user exempts the site.

HOW TECHNICAL CHOICES AFFECT THE THREE INDICATORS

ChoicePUEWUEERF
Dry air free coolingGood in a temperate climateLowLow: low-temperature heat, hard to reuse
Adiabatic or evaporative coolingVery goodHigher, especially in summerLow
Direct liquid coolingGoodDepends on heat rejection: dry coolers or towersMore favourable: warmer water is easier to reuse if a heat user exists
Heat pump to raise temperatureMay worsen depending on metering boundaryNeutralHigher

These trends are indicative: results depend on climate, density, setpoints and metering. Two points often decide everything: a heat user nearby (heat network, industrial site, greenhouses), which is a siting question, and metering quality, without which no indicator can be defended. See waste heat and district heating in France.

WHAT WE DO

For an operating site: check metering and data, calculate the three indicators consistently year on year, prepare the report, and if an ERF of 0.20 cannot be reached, build or review the cost-benefit analysis. For a project: build the three indicators into the brief, compare cooling options, and look for a heat user from site selection onwards.

Geoffrey Garriga

Geoffrey Garriga

Energy compliance & building services

Building services and energy engineer, 15+ years: tertiary decree, regulatory energy audits, building automation and control systems, HVAC and electrical design. Read his profile →

HOW IT WORKS

A first conversation. You describe the project and the decision at stake. We tell you whether we can help, and who will be involved.
A confidentiality agreement. Signed before you send us any document.
A written, fixed-fee proposal. Scope, deliverables, timeline and fees set in advance: no open-ended time-based billing.
The assignment and debrief. A written deliverable, a debrief session, and the questions to put to the grid operator or your partners.

WHAT WE COMMIT TO

Recent assignments

Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.

Independence

We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.

Framework

Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.

DESCRIBE YOUR SITUATION

A few lines are enough: the project, the document or decision at stake, and your deadline. We come back to you to set up a first conversation.

First conversation confidential and with no commitment. Fixed fees proposed in writing before any assignment. Best-efforts obligation.

Sources: French law no. 2025-391 of 30 April 2025 (DDADUE); decree no. 2025-1382 of 29 December 2025, Energy Code articles D. 236-1 to D. 236-7 and R. 237-1 to R. 237-7, as analysed by Gide Loyrette Nouel and DCmag (in French); Delegated Regulation (EU) 2024/1364. General information, to be checked against the official text for a specific file.

FREQUENTLY ASKED QUESTIONS

My data center is 600 kW: am I concerned?

Yes for annual reporting, before 15 May. The waste heat reuse obligation only applies from 1 MW of installed capacity.

What if my ERF does not reach 0.20?

You may be exempted if a cost-benefit analysis shows technical or economic impossibility. You must still reuse the feasible share.

Is a good PUE enough?

No. A very low PUE achieved with evaporative cooling can come with high water use, and low-temperature heat is hard to reuse. The three indicators must be traded off together.