DefinitionShare of the site's energy reused outside it, usually as waste heat.

WHAT IS ERF (ENERGY REUSE FACTOR)?

In France, a data center of 1 MW or more must recover its waste heat or show through a cost-benefit analysis that it cannot. ERF measures what is actually reused.