Typical situation no. 16
A project developer has land with available power 35 km from Toulouse. Its prospects are concerned about the distance: response times for inference applications, and the cost and lead time of the fibre.
WHAT IS BLOCKING
- The latency added by 35 km of fibre is low, but the actual route can be twice as long as the straight-line distance.
- Without available dark fibre, a link must be built or leased, sometimes over several years.
- Customers need figures, not reassurances.
WHAT WE DO
- Calculation of actual latency for the possible routes.
- Inventory of available fibre infrastructure and of carriers able to serve the site.
- Costing of a redundant link using dark fibre or leased capacity.
- Quantified case for prospects.
WHAT YOU GET
- A connectivity note with measured or calculated latencies.
- The link options with costs and lead times.
- A case to present to customers.
Typical format: Connectivity study, two to three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our 12 ha plot is in an AU zone of the local land-use plan (PLU). Can we build a 60 MW data center on it?We are taking over a brownfield site with a former 63 kV substation. Can it be reused for a data center?A small 2 MW regional AI data center: what building to look for, and what power to check before visiting?We want to convert an 8,000 m² logistics warehouse into a data center. Slab, clear height, power: will it work?See all 93 situations →