Typical situation no. 26
An engineering group is managing the construction of a 150 MW campus. The 225 kV connection, with a customer substation to be built, requires a permanent interface with RTE for eighteen months. The project team does not have this expertise.
WHAT IS BLOCKING
- Managing an RTE connection agreement requires knowledge of the procedures, the contacts and the usual points of friction.
- Delays often arise on interface issues: protection, metering, connection testing.
- The person must be operational immediately.
WHAT WE DO
- Proposal of a high-voltage (HTB) connection expert from the network.
- Scoping of the assignment: presence, meetings, deliverables, reporting to the client.
- Regular oversight by GridReadiness.
WHAT YOU GET
- An experienced engineer dedicated to the grid interface.
- A monthly connection dashboard.
- Early warning of delay risks.
Typical format: Long-term staffing support, part-time or full-time. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 93 situations →