Typical situation no. 27
A general contractor is preparing its bid for a 40 MW data center. The high-voltage package accounts for a quarter of the contract value and the delivery date carries penalties. Its equipment lead time assumptions date from 2022.
WHAT IS BLOCKING
- Lead times for transformers, switchgear and generators have changed significantly since then.
- An underestimated lead time turns into penalties; an overly cautious one loses the tender.
- The bid is due in three weeks.
WHAT WE DO
- Review of the high-voltage specifications.
- Update of lead times by equipment family, based on market tracking and targeted supplier consultations.
- Identification of critical equipment to reserve in advance.
- Recommendations on the qualifications to include in the bid.
WHAT YOU GET
- A table of updated lead times, by equipment item.
- The risks to cover in the bid.
- A note that can be used in the bid presentation.
Typical format: Short engagement, one to two weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our RTE connection offer states energisation in 2032. Is that credible?We have an RTE exploratory study for 120 MW but no connection offer (PTF). Can we sign the promise of sale for the land?The primary substation 4 km away shows capacity, but Enedis mentions reinforcement. Is 12 MW at MV (HTA) realistic?We want to start at 10 MW and scale to 40 MW. Should we request the full 40 MW now?See all 93 situations →