Typical situation no. 101
An operator commissioned a 4 MW AI training hall in an existing data center. Since then, the UPS switch to batteries several times a month, and one trip cut part of the hall. The UPS supplier blames the grid; the operations team suspects the load.
WHAT IS BLOCKING
- Fast GPU load swings, a grid disturbance and poorly set protections produce similar symptoms.
- Event data from the UPS, the substation and the grid operator are not cross-checked.
- Each supplier defends its own equipment.
WHAT WE DO
- Collection and cross-check of event logs: UPS, protections, meters, grid operator data.
- On-site measurement of load and power quality during training.
- Review of UPS, transfer switch and protection settings.
- Hypotheses ranked by likelihood and a corrective plan.
WHAT YOU GET
- An independent diagnosis of what causes the trips.
- The fixes to make, from simplest to most significant.
- Evidence to discuss with the grid operator if the cause is external.
Proposed format: Diagnosis with a measurement campaign, three to four weeks. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.