Typical situation no. 58

A French manufacturer of low and medium voltage switchboards wants to benefit from long lead times at the major vendors. Its products are compliant, but no data center designer has it on their approved list.

WHAT IS BLOCKING

WHAT WE DO

  1. Identification of the technical and documentation requirements of designers and operators.
  2. Review of available certificates, tests and references.
  3. Preparation of a clear approval file with achievable lead times.
  4. Preparation of first meetings with specifiers.

WHAT YOU GET

Typical format: Short assignment, three to six weeks. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Anis Mokded

Anis Mokded

Design, commissioning & operations

View profile →
Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.

RELATED SITUATIONS