Typical situation no. 58
A French manufacturer of low and medium voltage switchboards wants to benefit from long lead times at the major vendors. Its products are compliant, but no data center designer has it on their approved list.
WHAT IS BLOCKING
- Designers often specify the same brands, out of habit and caution.
- Expected tests, certificates and references are not always written down.
- Lead time is an argument, provided it can be met.
WHAT WE DO
- Identification of the technical and documentation requirements of designers and operators.
- Review of available certificates, tests and references.
- Preparation of a clear approval file with achievable lead times.
- Preparation of first meetings with specifiers.
WHAT YOU GET
- A credible approval file.
- The list of gaps to close.
- A pitch built on lead times and availability.
Typical format: Short assignment, three to six weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
We are an electrical contractor and must provide a commissioning manager for 9 months on a 30 MW project.Our client is asking us for a high-voltage (HTB) connection engineer to manage the agreement with RTE for 18 months.We are bidding on a data center tender and must price the high-voltage package. Do our lead time assumptions hold up?We are a regional electrical contractor and want to enter the data center market. Where do we start?See all 61 situations →