Typical situation no. 30
An asset manager is launching a digital infrastructure fund classified under SFDR Article 9 of the EU regulation. Its first assets will be regional data centers. Investors are asking for precise, verifiable metrics.
WHAT IS BLOCKING
- The PUE reported by an operator is not always measured using a comparable method.
- Water consumption, the origin of electricity and heat reuse are rarely tracked.
- The data must hold up over time, not just at the time of acquisition.
WHAT WE DO
- Definition of a list of relevant, measurable metrics.
- Verification of each asset's ability to produce this data.
- Recommendations on metering, calculation method and reporting frequency.
- Alignment with European reporting obligations for data centers.
WHAT YOU GET
- A metrics framework with calculation methods.
- A diagnostic per asset.
- An annual reporting template.
Typical format: Scoping engagement, three to four weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
We are financing 60 MW. The sponsor says it has a signed connection offer (PTF). What is it really worth?Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?The business plan assumes 30% AI densification with no electrical works. Is that realistic?Should we fund the move to liquid cooling at a site built in 2014?See all 93 situations →