An operator with 6 MW of IT load measures an annual PUE of 1.55. Its recent competitors report 1.3. Its customers are starting to ask about it, and its electricity bill has doubled in three years.
WHAT IS BLOCKING
- At 6 MW of IT load, going from 1.55 to 1.35 represents about 10 GWh per year, or around one million euros depending on the electricity price.
- The savings lie in settings as much as in investment.
- Any change to the cooling must be made without risk to existing customers.
WHAT WE DO
- Analysis of existing measurements and verification of the PUE calculation method.
- Audit of cooling, power distribution and settings.
- Three-tier action plan: settings, minor works, investments.
- Calculation of the savings and payback period for each action.
WHAT YOU GET
- A costed and prioritised reduction plan.
- Expected savings for each action.
- A monthly PUE tracking dashboard.
Typical format: Energy audit, three to four weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.The municipality wants us to supply our waste heat to a district heating network. Does it make financial sense?See all 93 situations →