Typical situation no. 80
An urban community hosts its data in ageing server rooms. Several local businesses are also looking for nearby hosting. Councillors are considering a small 1 to 3 MW territorial data center and wonder about real demand, the operating model and the site.
WHAT IS BLOCKING
- Local business demand is often assumed, rarely measured.
- The choice of model, in-house, concession or private operator, determines investment and risk.
- Power and fibre availability at the candidate sites are unknown.
WHAT WE DO
- Survey of needs: the authority's services, businesses, public bodies.
- Comparison of possible models and their implications.
- Pre-qualification of candidate sites: power, fibre, land.
- Summary note for councillors, with next steps.
WHAT YOU GET
- A measure of real demand in the area.
- An informed choice of model.
- A short list of credible sites.
Typical format: Opportunity study of a few weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?See all 93 situations →