Typical situation no. 88
A developer is starting construction of its data center: civil works, electrical, HVAC, heavy lifts. Some fifteen contractors will follow and overlap on site. Nobody has yet been appointed to organise prevention.
WHAT IS BLOCKING
- Co-activity increases risk, especially during lifts and tests.
- Prevention plans, risk analyses and permits to work must be ready from day one.
- An accident or a site stoppage is costly for the schedule.
WHAT WE DO
- Organisation of site opening: contractor induction, prevention plans, risk analyses.
- Preparation of high-risk operations: lifting transformers and generators, work at height, lockouts.
- Inspections, audits and subcontractor monitoring.
- Reporting to the owner.
WHAT YOU GET
- A site opened with its safety rules.
- High-risk operations prepared.
- A clear view of safety for the owner.
Typical format: One-off support or for the duration of the build. Every assignment is scoped in writing before it starts.