Typical situation no. 62
A design firm and an integrator have won the design and build of a 24 MW data center in the Paris region. The Electrical Design Manager role has been open for four months with no hire. The international client expects a bilingual counterpart from day one.
WHAT IS BLOCKING
- Profiles combining MV/LV distribution, UPS, generators and client-facing leadership are very scarce.
- Without a manager, coordination between design, procurement and site falls on already stretched teams.
- Early design decisions commit the project for the rest of its life.
WHAT WE DO
- An expert on assignment, full or part time, while you recruit.
- Review of the electrical architecture and decisions already made.
- Coordination of electrical design with other packages and the client.
- Handover preparation for the permanent hire.
WHAT YOU GET
- An operational Electrical Design Manager from project kick-off.
- Traceable, justified design decisions.
- A clean handover to the permanent hire.
Typical format: Assignment of three to nine months, full or part time. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.