Typical situation no. 42
A 3 MW operator runs six chillers from 2012 using a high global warming potential refrigerant. The EU F-gas Regulation is gradually phasing down these refrigerants, and refill prices rise every year.
WHAT IS BLOCKING
- Replacing chillers on a live site requires phasing that never interrupts cooling.
- Some conversions to another refrigerant reduce cooling capacity.
- The work can be an opportunity to improve energy efficiency, or to make it worse.
WHAT WE DO
- Inventory of equipment, refrigerants and applicable obligations.
- Comparison of options: conversion, gradual replacement, change of technology.
- Costing and schedule, with phasing compatible with operations.
- Estimate of the impact on PUE.
WHAT YOU GET
- A reasoned, costed recommendation.
- A works schedule with no service interruption.
- The expected energy savings.
Typical format: Technical study, three weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.The municipality wants us to supply our waste heat to a district heating network. Does it make financial sense?See all 93 situations →