Typical situation no. 22
An 8 MW operator receives an average of 200 alarms a day from its BMS. Most are minor alerts or duplicates. Last month, a genuine temperature alarm on a chiller was acknowledged without being acted on.
WHAT IS BLOCKING
- Too many alarms defeat the purpose: the team ends up acknowledging everything.
- Thresholds were set at commissioning and have never been reviewed.
- There is no link between an alarm and the procedure to follow.
WHAT WE DO
- Analysis of three months of alarm history.
- Classification into criticality levels and removal of duplicates.
- Threshold review with the monitoring system integrator.
- Linking each critical alarm to a procedure and an escalation matrix.
WHAT YOU GET
- A reduced, prioritised alarm list.
- An up-to-date escalation matrix.
- Team training on the new settings.
Typical format: Three- to four-week engagement. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS

Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.The municipality wants us to supply our waste heat to a district heating network. Does it make financial sense?See all 93 situations →