Typical situation no. 51

An operator bought three data centers of 2 to 8 MW within eighteen months. Each has its own maintenance contractors, procedures, monitoring and incident history. Management does not know which site carries the most risk, or where to invest first.

WHAT IS BLOCKING

WHAT WE DO

  1. Technical review of each site using a common grid: power, cooling, safety, maintenance, monitoring.
  2. Risk ranking by site, from most critical to least urgent.
  3. Review of maintenance contracts and the service levels actually delivered.
  4. Prioritised action and investment plan, site by site.

WHAT YOU GET

Typical format: Multi-site review, four to six weeks depending on the number of sites. Every assignment is scoped in writing before it starts.

THE EXPERT FOR THIS

Anis Mokded

Anis Mokded

Design, commissioning & operations

View profile →
Xavier Watrelos

Xavier Watrelos

HV grid connection & industrial projects

View profile →

Typical situation, based on real enquiries and anonymised. Figures are illustrative.