Typical situation no. 55
A developer has received its design firm's preliminary design for a 50 MW AI factory. Prospective customers expect liquid-cooled racks above 100 kW. The developer wants an independent view before detailed design.
WHAT IS BLOCKING
- The target densities change power distribution, protection and floor loading.
- The liquid cooling choice commits the site for years: water temperature, air share, redundancy.
- Factory-built modules bring their own interfaces and commissioning constraints.
WHAT WE DO
- Review of the power architecture and redundancy against target densities.
- Review of the cooling solution, temperatures and residual air share.
- Analysis of interfaces with factory-built modules and the testing strategy.
- List of questions and additions to request from the design firm.
WHAT YOU GET
- A written, independent opinion on the preliminary design.
- Points to fix before detailed design.
- A clear basis for discussion with the designer.
Typical format: Design review, two to four weeks. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?See all 93 situations →