Typical situation no. 78
A developer has obtained a 40 MW connection offer for land on the edge of a regional city. It is weighing several targets: colocation operator, AI player, enterprise user. Investors want a clear positioning before committing.
WHAT IS BLOCKING
- Each customer type has its own requirements: density, connectivity, schedule, financial strength.
- A site designed for one use is costly to convert to another.
- Without clear positioning, the pitch to investors and operators stays vague.
WHAT WE DO
- Analysis of the site's strengths: power, date, fibre, land, proximity to customers.
- Comparison of possible uses and their technical requirements.
- Recommendation of a main positioning and a fallback.
- Preparation of a clear site pack for operators.
WHAT YOU GET
- A reasoned positioning for the site.
- The technical requirements of the chosen use.
- A pack to present to operators and investors.
Typical format: Assignment of a few weeks, linked to the site readiness pack. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.
RELATED SITUATIONS
Our site has only one fibre entry. Our customers require two physically separate paths.We want to host cloud customers. Which internet exchange point (IX) should we connect to, and at what transport cost?We need to move from 10 kW racks to 60 kW GPU racks in an existing data hall.Our fund owns three 2 to 6 MW data centers built between 2010 and 2016. Will they still be lettable in ten years?See all 93 situations →