Typical situation no. 100
A regional operator runs three data centers of 1 to 4 MW. It has heard of the tertiary decree, the European reporting, waste heat and building controls, without knowing what applies to each site or when. Its technical team is already busy with operations.
WHAT IS BLOCKING
- Obligations depend on each site's power, floor area and construction date.
- Some deadlines require data the operator does not yet collect.
- A missed obligation can lead to a penalty or a public notice.
WHAT WE DO
- Inventory of the three sites: power, floor area, equipment, available data.
- Table of obligations applicable to each site, with deadlines.
- Prioritisation by deadline, risk and effort.
- 18-month action plan, with the data to collect.
WHAT YOU GET
- A clear calendar, site by site.
- The actions to launch first.
- The list of data to set up now.
Proposed format: Regulatory diagnostic, two to three weeks. Every assignment is scoped in writing before it starts.
THE KEY EXPERTS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.