DefinitionIn a GridScore note, how far a finding has been checked: high (documents and site), medium (documents only), low (declared).
WHAT IS A FINDING'S CONFIDENCE LEVEL FOR?
It separates what has been checked from what has only been declared. For a lender or buyer, it is often the most useful information in a note.
RELATED TERMS
- GridScore : Five-dimension site assessment grid, applied by our experts on assignments.
- Technical due diligence : Independent check, before an investment or a loan, of what drives a project's delivery: grid connection, equipment, permits, timeline.
- Reserved versus firm capacity : A queue position reserves capacity, but the power actually available depends on grid works and reinforcements, sometimes in tranches, with possible operating limitations in between.