Typical situation no. 92

At a consultation meeting, residents ask whether the future data center's dry coolers will warm the air around the site. The developer has no study and no figures to present.

WHAT IS BLOCKING

WHAT WE DO

  1. Check of the assumptions of a heat rejection study: heat released, hottest days, winds, night-time operation.
  2. Review of dry cooler layout: distances, height, link with noise.
  3. Heat reuse options.
  4. Preparation of answers and materials for the consultation.

WHAT YOU GET

Typical format: Technical review and consultation preparation, three to four weeks. Every assignment is scoped in writing before it starts.