Typical situation no. 106
A 20 MW colocation project is presented at a public meeting. Some residents link it to the AI campuses of several hundred megawatts reported in the press: water, noise, electricity. The town hall wants to answer precisely, without downplaying or overstating.
WHAT IS BLOCKING
- The same word "data center" covers facilities of very different scales.
- Figures in the press often concern other types of sites.
- An answer perceived as defensive reinforces distrust.
WHAT WE DO
- Factual description of the project: type, power, cooling, water, noise.
- Comparison with other data center types, at the right scale.
- Answers to the most frequent questions, with supporting documents.
- Support at the public meeting, if the municipality wishes.
WHAT YOU GET
- Verifiable answers, at the right scale.
- Clear material for officials and residents.
- A calmer public exchange.
Typical format: Short assignment, before the public meeting. Every assignment is scoped in writing before it starts.