Typical situation no. 107
The municipality was approached six months ago. The file is moving, the local press is covering it and a public meeting is set. The mayor wants to present the project honestly, with its benefits and impacts, without being caught out by technical questions.
WHAT IS BLOCKING
- Available information comes mostly from the developer.
- Questions on water, noise, power and jobs need figures.
- Dialogue comes late if it starts after the building permit is filed.
WHAT WE DO
- Neutral summary of the project and open points.
- List of likely questions, with available answers and those to obtain from the developer.
- Simple presentation material for the mayor.
- An expert present at the meeting for technical questions, if wished.
WHAT YOU GET
- A prepared mayor, able to say what is known and what is not.
- Developer commitments that can be announced publicly.
- A basis for the rest of the consultation.
Typical format: Preparation over two to three weeks, meeting included. Every assignment is scoped in writing before it starts.
THE EXPERT FOR THIS


Typical situation, based on real enquiries and anonymised. Figures are illustrative.