THE GOVERNMENT PROGRAMME — 63 SITES

French Government AI Infrastructure Sites — June 2026
Total identified: 63 sites across metropolitan France
Publicly confirmed: 26 sites · 1,100+ hectares · 8 sites with 1 GW+ capacity
RTE fast-track sites: 4 sites · 400–1,000 MW · CRE-approved procedure
EDF brownfield programme: Loire-sur-Rhône (AMI open) · Moselle (contracted) · Seine-et-Marne (contracted)
Source: Direction Générale des Entreprises + Choose France + RTE

CHOOSE FRANCE 2026 — COMMITTED CAPACITY

SoftBank (3.1 GW Hauts-de-France), Ardian (500 MW Île-de-France, grid secured), Nebius (240 MW Béthune), Digital Realty (4 sites in construction) and Mistral AI (€4B) have committed significant capacity from this pipeline. The remaining available sites are being identified and qualified by GridReadiness monthly.

CANDIDATE BROWNFIELD SITES WE TRACK

Beyond the government list, GridReadiness tracks additional French brownfield candidates with existing HV infrastructure — identified by crossing BASIAS, Cartofriches and RTE network data. These sites have never been publicly marketed to AI data center developers. Access the brownfield database →

HOW TO ACCESS CURRENT SITE AVAILABILITY

Current availability status, capacity specifications, ownership details and development agency contacts are available exclusively to GridReadiness consulting clients. The France Site + Equipment Sourcing service provides full database access with direct introductions.