I started GridReadiness from one observation: the conversation about AI infrastructure is dominated by compute — GPUs, chips, data center construction costs. The power infrastructure layer — the grid connections, the transformers, the substations — was barely covered, poorly understood and consistently underestimated as a deployment risk.J'ai créé GridReadiness à partir d'une observation : la conversation sur l'infrastructure IA est dominée par le compute — GPU, chips, coûts de construction. La couche infrastructure électrique — raccordements réseau, transformateurs, sous-stations — était à peine couverte, mal comprise, et systématiquement sous-estimée comme risque de déploiement.
In 2026, that gap has closed in the worst possible way. 85% of major player data center projects are delayed or cancelled because of power infrastructure. The US government has declared transformers a national security emergency. Northern Virginia's grid queue stretches 10 years.
France has what the US needs right now: nuclear baseload at €50/MWh, brownfield industrial sites with existing HV connections, and EU transformer manufacturers delivering in 20-32 months. GridReadiness documents this gap and helps developers and investors navigate it.
BACKGROUNDPARCOURS
Celerant Consulting / Hitachi Consulting: operational performance consulting with major European industrial groups — Ishikawa root cause analysis, value stream mapping, lean manufacturing (2006–2007)
Le Secret Naturel: General Manager, family cosmetics business (2007–2013)
Oxilia Care: Founder and CEO, regulated services company — €1.5M fundraise, structured organization (2013–present)
AAC Conseils: DG de transition, management mandates, Arc méditerranéen (2025–present)
GridReadiness: Founder (2026–present)
Education: NEOMA Business School · Finance and Strategy
WHY POWER INFRASTRUCTURE, NOT CHIPSPOURQUOI L'INFRASTRUCTURE ÉLECTRIQUE, PAS LES CHIPS
I am not an electrical engineer. I am a CEO and operational analyst who reads industrial supply chains — which is exactly what the transformer and grid connection market is: an industrial supply chain with long lead times, monopoly risks and geographic constraints that most technology investors do not understand.
At Celerant/Hitachi Consulting, I spent years analyzing industrial bottlenecks for major European groups. The AI power infrastructure crisis is the same analytical problem applied to a new industry: where is the constraint, what is its timeline, and how do you route around it?
The answer — France brownfield sites, EU second-tier transformer manufacturers, nuclear baseload — is available to anyone who looks at the supply chain with the right lens. GridReadiness provides that lens.
WHAT GRIDREADINESS ISCE QU'EST GRIDREADINESS
- Market intelligence on AI data center power infrastructure bottlenecks — updated monthly
- Grid deployment risk assessment — Go/No-go verdicts in 72 hours
- France site + equipment sourcing — brownfield identification + EU transformer sourcing
- The only English-language source that systematically tracks EU transformer lead times, French brownfield availability and RTE connection timelines for AI developers
WHAT GRIDREADINESS IS NOTCE QUE GRIDREADINESS N'EST PAS
- A licensed electrical engineering firm
- A legal or regulatory advisor
- A data center architecture consultant
- A generalist technology consultant
I am transparent about this because the boundaries matter. Our intelligence is valuable precisely because it is focused. When a project requires licensed engineering, we say so and we know who to refer to.
Get in touch
If you are evaluating AI data center deployment in France or Europe and want to understand the power infrastructure constraints on your specific project, contact me directly.Si vous évaluez un déploiement de data center IA en France ou en Europe et souhaitez comprendre les contraintes d'infrastructure électrique de votre projet, contactez-moi directement.