Independent data center consulting firm and expert network, 360°

We move your data center projects forward, by your side.

Grid connection, financing, consultation and public affairs, crisis management, team hiring: a network of named independent experts, for small and large projects, from site search to operations and site modernisation.

Meet the team

Fixed fees · No commission · One point of contact

Frédéric ArnaudXavier WatrelosAnis MokdedBlandine CazellesFrancis GillardAlain Constantinidis

What we do

Engineering, and everything that moves a project forward

We take a project from land to long-term operation: sites and power, financing and due diligence, consultation with elected officials and residents, crisis readiness, hiring, commissioning and retrofit. Consulting engineering sits at the centre of that, with connection studies and applications, electrical audits, design reviews and on-site verification. But projects rarely stall on engineering alone. We are not a design-and-build contractor and we sell no equipment. We advise, verify and act on the ground, alongside developers, operators, lenders, insurers and local authorities, with the right expert for each subject.

Sites

Sites and land

Site search, verification of claimed power, planning, market-ready site files for landowners and local authorities.

Learn more →
Xavier WatrelosNicolas GuillaumeXavier · Nicolas

Power

Grid connection and power

PTF request to RTE, review of connection offers, queue position, power strategy and a realistic energisation date.

Learn more →
Xavier WatrelosBertrand GriveletXavier · Bertrand

Lenders

Financing and due diligence

What the grid documents, land and timeline really commit to, before your investment committee.

Learn more →
Frédéric ArnaudXavier WatrelosFrédéric · Xavier

On site

Site verification and insurers

Independent risk surveys and technical reviews for insurers and brokers, on-site checks of claimed power, equipment and site condition.

Learn more →
Anis MokdedFrancis GillardXavier WatrelosAnis · Francis · Xavier

Territories

Consultation and public affairs

Your outsourced public affairs team: elected officials, prefecture, state services, residents. We prepare and lead the dialogue before the permit.

Learn more →
Blandine CazellesFrédéric ArnaudBlandine · Frédéric

Crisis

Crisis communication and management

Opposition, incident, media exposure: a team ready to act, verifiable messages and a prepared spokesperson.

Learn more →
Blandine CazellesBlandine

Teams

Hiring and team building

HVAC technicians, electricians, shift leads: we define the needs, organise 24/7 operations and help you hire, with local employment bodies.

Learn more →
Anis MokdedAlain ConstantinidisAnis · Alain

Operations

Commissioning and operations

Commissioning readiness, procedures, operations audit, energy compliance, then long-term support.

Learn more →
Anis MokdedAlain ConstantinidisGeoffrey GarrigaAnis · Alain · Geoffrey

Evolution

Retrofit and modernisation

Technology moves fast: end-of-life equipment replacement, AI densification, liquid cooling, better heat reuse. We prepare and support these upgrades while the site stays live.

Learn more →
Francis GillardAnis MokdedGeoffrey GarrigaFrancis · Anis · Geoffrey

Who we are

Field people who know how to explain

Our experts have built, connected and operated sites. They come on site, and they make a technical file understandable for those who must decide.

On the ground

Site visits, substations, construction sites, live data halls: we check on site what the documents claim, and we go with our clients to the site.

Building relationships

Elected officials, prefecture, RTE and Enedis, residents, operators, lenders: we know how to talk to each, organise exchanges and move discussions forward.

Building files, and explaining them

Grid application, site file, technical review: we build solid files, then explain them clearly to an investment committee, a town council or a prefect.

The long run

A data center project takes years. We stay by your side.

We help our clients consult, talk with every stakeholder and plan, then we support delivery, commissioning, long-term operation and the evolution of the site as technology changes.

01Consultwith officials, the state and residents
02Engagewith RTE, Enedis and authorities
03Planphasing, grid connection, teams
04Support deliveryalongside the project owner
05Commissiontests, procedures, trained teams
06Operate long termaudits, compliance, support
07Upgrade the siteretrofit, cooling, heat reuse

The experts

People, not a platform

Eleven independent experts, each with a public profile. You always know who is working on your file.

Frédéric Arnaud

Frédéric Arnaud

Founder and coordinator

Single point of contact on every assignment. Former PwC auditor, Hitachi Consulting consultant, fifteen years as a managing director.

View profile →
Xavier Watrelos

Xavier Watrelos

HV grid connection and industrial projects

20+ years of industrial projects from €5m to €100m, HV and MV connections, commissioning.

View profile →
Anis Mokded

Anis Mokded

Design, commissioning and operations

Led a Tier IV data center, then ran operations for hyperscale and AI campuses above 100 MW.

View profile →
Blandine Cazelles

Blandine Cazelles

Crisis communication and public affairs

Former regional communications director at La Poste, chief of staff at the French Senate, IHEDN auditor.

View profile →
Francis Gillard

Francis Gillard

Data center design and audits

Thirty years in HVAC engineering, twenty in data centers, Accredited Tier Designer.

View profile →
Alain Constantinidis

Alain Constantinidis

Data center operations and DORA

15+ years running Tier III and Tier IV rooms, operations audits, DORA compliance.

View profile →
Nicolas Guillaume

Nicolas Guillaume

Interconnection and fibre

Founder of a B2B telecom operator with 800 km of fibre, former France-IX board member.

View profile →
Jean-Yves Egidio

Jean-Yves Egidio

Construction health and safety

Nearly twenty years on industrial and energy sites, including data centers in Marseille.

View profile →
Bertrand Grivelet

Bertrand Grivelet

Battery storage and solar

Sizing, business models and due diligence for solar and battery projects.

View profile →
Etienne Sauvage

Etienne Sauvage

Solar PV and commissioning

25 years in solar PV, 300+ assignments on grid-connected plants.

View profile →
Geoffrey Garriga

Geoffrey Garriga

Energy compliance and building services

Tertiary decree, regulatory energy audits, BACS decree, HVAC and electrical design.

View profile →
Join the network →

How we work

Small and large projects

From a site of a few megawatts to a campus of several hundred: the same rigour, a team of the right size.

Flexibility and speed

A one-off question, a few weeks’ assignment or several years of support: we adapt to your situation.

Independent experts

Named, experienced, brought in by topic. No commission, no conflict of interest, one party advised.

One point of contact

Frédéric coordinates every assignment, from scoping to delivery, with a written fixed fee before work starts.

The truth is on the ground

Software spots signals. At GridReadiness, we verify them, on site, with you.

Entering the French market

Your independent partner on the ground in France

International developers, operators and investors often discover French rules late: the RTE queue, permits, local acceptance. We read the original documents in French, visit the site and tell you, in English, what holds and what remains to be confirmed.

Get the guide: building a data center in France →
  • One English-speaking point of contact
  • Named French experts on grid, permits and operations
  • Original documents read, site visited, opinion in writing
  • No commission, one side of the table only

One page on the grid only: the five grid filters.

Our principle: one side of the table

On any project, we work for one client only: the developer, the buyer, the lender or the local authority, never two of them. We take no commission, on equipment, land or capacity. Our fees are fixed and paid by the party we advise. We do not market projects, project companies or subscriptions: we are paid for advice only.

WHAT WE COMMIT TO

Recent assignments

Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.

Independence

We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.

Framework

Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.

Intelligence Library

LATEST ARTICLES

★ Flagship analysis · Lenders & developers

Compute ordered is not compute installed.
The banks now agree.

Jefferies, Morgan Stanley and Goldman Sachs now measure the gap between chips sold and data centers delivered.

September 2026 · 8 min read

Read the analysis →

Hosting · Method

"AI-Ready": ten questions to ask before signing

October 2026 · 5 min

Analysis · Financing

The neocloud credit squeeze: what it would change for sites in France

October 2026 · 6 min

Analysis · Financing

Stranded compute: when GPUs arrive before the grid

October 2026 · 5 min

THE GRIDREADINESS MONTHLY LETTER

Grid connection, equipment and data center projects in France: what matters, once a month.

Your email is used only for this letter. Legal notice.

Thank you, you are subscribed.

Sending failed. Email fred@gridreadiness.com.

EUROPEAN TRANSFORMER LEAD TIME INDEX

Lead times for 14 transformer product lines, updated every quarter. Q3 2026 edition now available.

Get the latest edition now, and the next ones by email when they are published.

Thank you. Your copy is ready: Download the Lead Time Index (PDF) →

Sending failed. Email fred@gridreadiness.com and we will send it to you.

All our publications →

DESCRIBE YOUR SITUATION

A few lines are enough: the project, the document or decision at stake, and your deadline. We come back to you to set up a first conversation.

First conversation confidential and with no commitment. A non-disclosure agreement can be signed before any documents are shared. Fixed fees proposed in writing before any assignment. Best-efforts obligation.

All our services and resources

FREQUENTLY ASKED QUESTIONS

What is GridReadiness?

GridReadiness is a data center consulting and owner's representative pure player in France and Europe, independent from design and construction and backed by an expert network, from grid connection to crisis management. Led by Frédéric Arnaud, the client's single point of contact, it covers site selection and preparation, RTE and Enedis connection, the design brief and engineering procurement, project steering, commissioning, operations audits, lender due diligence and support for public bodies, bringing in independent experts as each mission requires.

How long does a data center grid connection take in France?

For a large load, several years. The timeline depends mainly on the connection document obtained (exploratory study, accepted offer or signed agreement), the grid works required and their permits, and high-voltage equipment lead times. RTE's fast-track HTB3 procedure targets three to four years for 400 MW to 1 GW on selected sites.

Who does GridReadiness work for?

Data center developers and operators, EPC contractors and electrical integrators, infrastructure funds, lenders, battery storage developers, and the municipalities and public bodies hosting a project. Never, on the same project, for both the developer and the host community.

How does GridReadiness stay independent?

We take no commission on equipment or site transactions, we never act for both sides of the same project, and every mission is scoped in writing (scope, deliverables, timing) before it starts. If one of our experts is on assignment with a developer or an EPC contractor, we do not carry out the due diligence of that same project for a lender, nor support the host community on it.