Independent data center consulting firm and expert network, 360°
Grid connection, financing, consultation and public affairs, crisis management, team hiring: a network of named independent experts, for small and large projects, from site search to operations and site modernisation.
Fixed fees · No commission · One point of contact






What we do
We take a project from land to long-term operation: sites and power, financing and due diligence, consultation with elected officials and residents, crisis readiness, hiring, commissioning and retrofit. Consulting engineering sits at the centre of that, with connection studies and applications, electrical audits, design reviews and on-site verification. But projects rarely stall on engineering alone. We are not a design-and-build contractor and we sell no equipment. We advise, verify and act on the ground, alongside developers, operators, lenders, insurers and local authorities, with the right expert for each subject.
Sites
Site search, verification of claimed power, planning, market-ready site files for landowners and local authorities.
Learn more →Power
PTF request to RTE, review of connection offers, queue position, power strategy and a realistic energisation date.
Learn more →Lenders
What the grid documents, land and timeline really commit to, before your investment committee.
Learn more →On site
Independent risk surveys and technical reviews for insurers and brokers, on-site checks of claimed power, equipment and site condition.
Learn more →Territories
Your outsourced public affairs team: elected officials, prefecture, state services, residents. We prepare and lead the dialogue before the permit.
Learn more →Crisis
Opposition, incident, media exposure: a team ready to act, verifiable messages and a prepared spokesperson.
Learn more →Teams
HVAC technicians, electricians, shift leads: we define the needs, organise 24/7 operations and help you hire, with local employment bodies.
Learn more →Operations
Commissioning readiness, procedures, operations audit, energy compliance, then long-term support.
Learn more →Evolution
Technology moves fast: end-of-life equipment replacement, AI densification, liquid cooling, better heat reuse. We prepare and support these upgrades while the site stays live.
Learn more →Who we are
Our experts have built, connected and operated sites. They come on site, and they make a technical file understandable for those who must decide.
Site visits, substations, construction sites, live data halls: we check on site what the documents claim, and we go with our clients to the site.
Elected officials, prefecture, RTE and Enedis, residents, operators, lenders: we know how to talk to each, organise exchanges and move discussions forward.
Grid application, site file, technical review: we build solid files, then explain them clearly to an investment committee, a town council or a prefect.
The long run
We help our clients consult, talk with every stakeholder and plan, then we support delivery, commissioning, long-term operation and the evolution of the site as technology changes.
The experts
Eleven independent experts, each with a public profile. You always know who is working on your file.

Founder and coordinator
Single point of contact on every assignment. Former PwC auditor, Hitachi Consulting consultant, fifteen years as a managing director.
View profile →
HV grid connection and industrial projects
20+ years of industrial projects from €5m to €100m, HV and MV connections, commissioning.
View profile →
Design, commissioning and operations
Led a Tier IV data center, then ran operations for hyperscale and AI campuses above 100 MW.
View profile →
Crisis communication and public affairs
Former regional communications director at La Poste, chief of staff at the French Senate, IHEDN auditor.
View profile →
Data center design and audits
Thirty years in HVAC engineering, twenty in data centers, Accredited Tier Designer.
View profile →
Data center operations and DORA
15+ years running Tier III and Tier IV rooms, operations audits, DORA compliance.
View profile →
Interconnection and fibre
Founder of a B2B telecom operator with 800 km of fibre, former France-IX board member.
View profile →
Construction health and safety
Nearly twenty years on industrial and energy sites, including data centers in Marseille.
View profile →
Battery storage and solar
Sizing, business models and due diligence for solar and battery projects.
View profile →
Solar PV and commissioning
25 years in solar PV, 300+ assignments on grid-connected plants.
View profile →
Energy compliance and building services
Tertiary decree, regulatory energy audits, BACS decree, HVAC and electrical design.
View profile →From a site of a few megawatts to a campus of several hundred: the same rigour, a team of the right size.
A one-off question, a few weeks’ assignment or several years of support: we adapt to your situation.
Named, experienced, brought in by topic. No commission, no conflict of interest, one party advised.
Frédéric coordinates every assignment, from scoping to delivery, with a written fixed fee before work starts.
The truth is on the ground
Software spots signals. At GridReadiness, we verify them, on site, with you.
Entering the French market
Your independent partner on the ground in France
International developers, operators and investors often discover French rules late: the RTE queue, permits, local acceptance. We read the original documents in French, visit the site and tell you, in English, what holds and what remains to be confirmed.
Get the guide: building a data center in France →One page on the grid only: the five grid filters.
Our principle: one side of the table
On any project, we work for one client only: the developer, the buyer, the lender or the local authority, never two of them. We take no commission, on equipment, land or capacity. Our fees are fixed and paid by the party we advise. We do not market projects, project companies or subscriptions: we are paid for advice only.
Review of connection documents and the announced energisation date for a European data center developer, ahead of its investment decision. Audit of high-voltage equipment sourcing for a petrochemical group.
We do not design, build or sell equipment. No commission, no brokerage. Never on both sides of the same project.
Confidentiality agreement before any document. Professional liability insurance. Best-efforts obligation: only RTE and Enedis commit to capacity and a date.
Intelligence Library
★ Flagship analysis · Lenders & developers
Compute ordered is not compute installed.
The banks now agree.
Jefferies, Morgan Stanley and Goldman Sachs now measure the gap between chips sold and data centers delivered.
September 2026 · 8 min read
Read the analysis →
Hosting · Method
"AI-Ready": ten questions to ask before signing
October 2026 · 5 min
Analysis · Financing
The neocloud credit squeeze: what it would change for sites in France
October 2026 · 6 min
Analysis · Financing
Stranded compute: when GPUs arrive before the grid
October 2026 · 5 min
THE GRIDREADINESS MONTHLY LETTER
Grid connection, equipment and data center projects in France: what matters, once a month.
Your email is used only for this letter. Legal notice.
Thank you, you are subscribed.
Sending failed. Email fred@gridreadiness.com.
EUROPEAN TRANSFORMER LEAD TIME INDEX
Lead times for 14 transformer product lines, updated every quarter. Q3 2026 edition now available.
Get the latest edition now, and the next ones by email when they are published.
Thank you. Your copy is ready: Download the Lead Time Index (PDF) →
Sending failed. Email fred@gridreadiness.com and we will send it to you.
FAQ
GridReadiness is a data center consulting and owner's representative pure player in France and Europe, independent from design and construction and backed by an expert network, from grid connection to crisis management. Led by Frédéric Arnaud, the client's single point of contact, it covers site selection and preparation, RTE and Enedis connection, the design brief and engineering procurement, project steering, commissioning, operations audits, lender due diligence and support for public bodies, bringing in independent experts as each mission requires.
For a large load, several years. The timeline depends mainly on the connection document obtained (exploratory study, accepted offer or signed agreement), the grid works required and their permits, and high-voltage equipment lead times. RTE's fast-track HTB3 procedure targets three to four years for 400 MW to 1 GW on selected sites.
Data center developers and operators, EPC contractors and electrical integrators, infrastructure funds, lenders, battery storage developers, and the municipalities and public bodies hosting a project. Never, on the same project, for both the developer and the host community.
We take no commission on equipment or site transactions, we never act for both sides of the same project, and every mission is scoped in writing (scope, deliverables, timing) before it starts. If one of our experts is on assignment with a developer or an EPC contractor, we do not carry out the due diligence of that same project for a lender, nor support the host community on it.